{"id":1890,"date":"2016-03-08T05:48:11","date_gmt":"2016-03-08T05:48:11","guid":{"rendered":"http:\/\/modified.globecore.com\/?p=1890"},"modified":"2021-12-30T08:58:46","modified_gmt":"2021-12-30T08:58:46","slug":"business-trip-ghana","status":"publish","type":"post","link":"https:\/\/modified.globecore.com\/business-trip-ghana\/","title":{"rendered":"A Business Trip to Ghana"},"content":{"rendered":"<p style=\"text-align: justify\"><strong>In the first quarter of 2016 Globecore specialists visited Ghana.<\/strong><\/p>\n<p style=\"text-align: justify\">The objective of the visit was to inspect the current condition of a <a href=\"http:\/\/modified.globecore.com\/equipment\/bitumen-emulsion-equipment\/uvb-1-productivity-2-m3.html\">UVB-1 unit<\/a>, which has been in operation since 2012, and to share experience to incorporate customer feedback in the company\u2019s operations.<\/p>\n<p style=\"text-align: justify\">The total length of automobile roads in Ghana is 39.41 thousand kilometers, while the length of hardtop roads is only 11.67 thousand kilometers. This is not enough for the country; besides, the existing transportation routes require major repairs.<\/p>\n<p style=\"text-align: justify\">Application of bitumen emulsions makes it possible to create durable road surface with minimum consumption of binding material, to save fuel in production of \u201ccold\u201d emulsion-mineral mixes, to expand the road construction season and to reduce hazardous emissions into the atmosphere.<\/p>\n<p style=\"text-align: justify\">As a result of the inspection, <em><strong>GlobeCore\u2019s<\/strong><\/em> experts identified that 40000 m3 of bitumen emulsion were produced using the UBV-1 plant. The equipment is in operable condition and is ready to proceed with its contribution to the progress of the road-construction industry of Ghana.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the first quarter of 2016 Globecore specialists visited Ghana. The objective of the visit was to inspect the current condition of a UVB-1 unit, which has been in operation since 2012, and to share experience to incorporate customer feedback in the company\u2019s operations. The total length of automobile roads in Ghana is 39.41 thousand<a class=\"cg-read-more\" href=\"https:\/\/modified.globecore.com\/business-trip-ghana\/\" target=\"_blank\">Read More <\/a><\/p>\n","protected":false},"author":7,"featured_media":1891,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1890","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"language":"en","_links":{"self":[{"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/posts\/1890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/comments?post=1890"}],"version-history":[{"count":0,"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/posts\/1890\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/media\/1891"}],"wp:attachment":[{"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/media?parent=1890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/categories?post=1890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/modified.globecore.com\/en\/wp-json\/wp\/v2\/tags?post=1890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}